The strategic design intent for the MO Bristol Campus was centred on transforming a collection of disconnected and siloed buildings into a genuinely connected campus.
Charity | 80,000 sq ft | Cat A/B | Value £7.5m | 4 Buildings | Duration 50 Weeks
Campus Building
Lighting
Building Performance
20%
Increased existing AHU capacity to improve the wellbeing of staff from 10l/s to 12l/s